Increasing speed scheduling and flow scheduling
From MaRDI portal
Recommendations
- A competitive algorithm for minimizing weighted flow time on unrelated machines with speed augmentation
- Minimizing Maximum (Weighted) Flow-Time on Related and Unrelated Machines
- Minimizing maximum (weighted) flow-time on related and unrelated machines
- Scheduling jobs that arrive over time
- On-line scheduling to minimize Max flow time: an optimal preemptive algorithm
Cited in
(4)
This page was built for publication: Increasing speed scheduling and flow scheduling
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3060781)