Integrated scheduling and location models: single machine makespan problems
From MaRDI portal
Recommendations
- scientific article; zbMATH DE number 2242479
- Simultaneous scheduling and location (ScheLoc): The planar ScheLoc makespan problem
- Solving scheduling and location problems in the plane simultaneously
- An exact framework for the discrete parallel machine scheduling location problem
- Machine scheduling with deliveries to multiple customer locations
Cited in
(12)- Location, scheduling, design and integer programming
- Discrete parallel machine makespan ScheLoc problem
- 2-approximation algorithm for minmax absolute maximum lateness scheduling-location problem
- Simultaneous scheduling and location (ScheLoc): The planar ScheLoc makespan problem
- Robust absolute single machine makespan scheduling-location problem on trees
- scientific article; zbMATH DE number 2242479 (Why is no real title available?)
- Scheduling-location problem with drones
- An integrated approach for allocation and scheduling-location problems on graphs
- The minmax regret scheduling-location problem on trees with interval-data edge lengths
- Solving scheduling and location problems in the plane simultaneously
- The big cube small cube solution method for multidimensional facility location problems
- Location-routing: issues, models and methods
This page was built for publication: Integrated scheduling and location models: single machine makespan problems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3511520)