Tradeoff solutions in single machine production scheduling for minimizing flow time and maximum penalty (Q1121167)
From MaRDI portal
!
This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:
scientific article; zbMATH DE number 4102807
| Language | Label | Description | Also known as |
|---|---|---|---|
| default for all languages | No label defined |
||
| English | Tradeoff solutions in single machine production scheduling for minimizing flow time and maximum penalty |
scientific article; zbMATH DE number 4102807 |
Statements
Tradeoff solutions in single machine production scheduling for minimizing flow time and maximum penalty (English)
0 references
1989
0 references
single machine production scheduling
0 references
total flow time
0 references
maximum penalty
0 references
pseudopolynomial algorithm
0 references
0.8341326713562012
0 references
0.8269580006599426
0 references
0.815183162689209
0 references