An efficient heuristic based on machine workload for the flowshop scheduling problem with setup and removal (Q1339130)

From MaRDI portal
scientific article
Language Label Description Also known as
English
An efficient heuristic based on machine workload for the flowshop scheduling problem with setup and removal
scientific article

    Statements

    An efficient heuristic based on machine workload for the flowshop scheduling problem with setup and removal (English)
    0 references
    0 references
    0 references
    0 references
    1 December 1994
    0 references
    0 references
    \(n\) jobs, \(M\) machines flowshop scheduling
    0 references
    makespan
    0 references
    setup, processing and removal times
    0 references
    heuristic
    0 references
    bottleneck machines
    0 references