Scheduling a two-stage hybrid flow shop with parallel machines at the first stage (Q1357780)

From MaRDI portal

!

This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:

scientific article; zbMATH DE number 1021732
Language Label Description Also known as
default for all languages
No label defined
    English
    Scheduling a two-stage hybrid flow shop with parallel machines at the first stage
    scientific article; zbMATH DE number 1021732

      Statements

      Scheduling a two-stage hybrid flow shop with parallel machines at the first stage (English)
      0 references
      0 references
      0 references
      0 references
      16 June 1997
      0 references
      identical parallel machines
      0 references
      non-preemptive two-stage hybrid flow shop
      0 references
      maximum completion time
      0 references
      makespan
      0 references
      lower bounds
      0 references
      branch and bound
      0 references
      heuristics
      0 references

      Identifiers