Minimizing mean flowtime in a two-machine flowshop with sequence-independent setup times (Q1968586)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Publication:1968586 |
scientific article; zbMATH DE number 1419454
| Language | Label | Description | Also known as |
|---|---|---|---|
| default for all languages | No label defined |
||
| English | Minimizing mean flowtime in a two-machine flowshop with sequence-independent setup times |
scientific article; zbMATH DE number 1419454 |
Statements
Minimizing mean flowtime in a two-machine flowshop with sequence-independent setup times (English)
0 references
26 September 2000
0 references
mean flowtime
0 references
separate setup time
0 references
heuristic
0 references
scheduling
0 references
two-machine flowshop problem
0 references
branch-and-bound algorithm
0 references
0.8616452813148499
0 references
0.853013813495636
0 references
0.8436359167098999
0 references
0.8415891528129578
0 references