Scheduling personnel for the build-up of unit load devices at an air cargo terminal with limited space (Q2197157)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Scheduling personnel for the build-up of unit load devices at an air cargo terminal with limited space |
scientific article; zbMATH DE number 7241748
| Language | Label | Description | Also known as |
|---|---|---|---|
| default for all languages | No label defined |
||
| English | Scheduling personnel for the build-up of unit load devices at an air cargo terminal with limited space |
scientific article; zbMATH DE number 7241748 |
Statements
Scheduling personnel for the build-up of unit load devices at an air cargo terminal with limited space (English)
0 references
28 August 2020
0 references
scheduling
0 references
air cargo terminal
0 references
workforce scheduling
0 references
generalized set partitioning
0 references
unit load device
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0.7997240424156189
0 references
0.7482565641403198
0 references
0.7409424781799316
0 references
0.7309135794639587
0 references
0.7304700613021851
0 references