Single-machine scheduling with production and rejection costs to minimize the maximum earliness (Q2410087)
From MaRDI portal
!
This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:
scientific article; zbMATH DE number 6791860
| Language | Label | Description | Also known as |
|---|---|---|---|
| default for all languages | No label defined |
||
| English | Single-machine scheduling with production and rejection costs to minimize the maximum earliness |
scientific article; zbMATH DE number 6791860 |
Statements
Single-machine scheduling with production and rejection costs to minimize the maximum earliness (English)
0 references
17 October 2017
0 references
scheduling
0 references
production cost
0 references
rejection cost
0 references
maximum earliness
0 references
0 references
0.91102815
0 references
0.9102133
0 references
0.90943706
0 references
0.90849644
0 references
0.9028028
0 references
0.89786965
0 references
0.8964518
0 references
0.89523023
0 references
0.8951461
0 references