Two schemes of the branch-and-bound method for a flow shop total weighted tardiness minimization problem (Q2442499)
From MaRDI portal
!
This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:
scientific article; zbMATH DE number 6278231
| Language | Label | Description | Also known as |
|---|---|---|---|
| default for all languages | No label defined |
||
| English | Two schemes of the branch-and-bound method for a flow shop total weighted tardiness minimization problem |
scientific article; zbMATH DE number 6278231 |
Statements
Two schemes of the branch-and-bound method for a flow shop total weighted tardiness minimization problem (English)
0 references
3 April 2014
0 references
flow shop systems
0 references
branch-and-bound method
0 references
total weighted tardiness minimization
0 references
0.8430429100990295
0 references
0.8323227167129517
0 references
0.831932783126831
0 references