Analysis of the manufacturing lead time in a production system with non-renewal batch input, threshold policy and post-operation (Q2470273)

From MaRDI portal
scientific article
Language Label Description Also known as
English
Analysis of the manufacturing lead time in a production system with non-renewal batch input, threshold policy and post-operation
scientific article

    Statements

    Identifiers