A multi-objective lead time control problem in multistage assembly systems using an interactive method (Q2495993)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: A multi-objective lead time control problem in multistage assembly systems using an interactive method |
scientific article; zbMATH DE number 5037945
| Language | Label | Description | Also known as |
|---|---|---|---|
| default for all languages | No label defined |
||
| English | A multi-objective lead time control problem in multistage assembly systems using an interactive method |
scientific article; zbMATH DE number 5037945 |
Statements
A multi-objective lead time control problem in multistage assembly systems using an interactive method (English)
0 references
30 June 2006
0 references
multiple objective programming
0 references
production
0 references
numerical example
0 references
multistage assembly system
0 references
queueing network
0 references
manufacturing
0 references
Poisson process
0 references
optimal control
0 references
STEM method
0 references
0.91741836
0 references
0.89417434
0 references
0.85373414
0 references
0.85028934
0 references
0.83457077
0 references
0.8342931
0 references