Iterated greedy algorithms enhanced by hyper-heuristic based learning for hybrid flexible flowshop scheduling problem with sequence dependent setup times: a case study at a manufacturing plant (Q2664430)

From MaRDI portal

!

This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:

scientific article; zbMATH DE number 7335667
Language Label Description Also known as
default for all languages
No label defined
    English
    Iterated greedy algorithms enhanced by hyper-heuristic based learning for hybrid flexible flowshop scheduling problem with sequence dependent setup times: a case study at a manufacturing plant
    scientific article; zbMATH DE number 7335667

      Statements

      Iterated greedy algorithms enhanced by hyper-heuristic based learning for hybrid flexible flowshop scheduling problem with sequence dependent setup times: a case study at a manufacturing plant (English)
      0 references
      0 references
      0 references
      20 April 2021
      0 references
      hybrid flexible flowshop scheduling
      0 references
      iterated greedy search
      0 references
      hyper-heuristics
      0 references
      metaheuristics
      0 references
      0 references

      Identifiers