Iterated greedy algorithms enhanced by hyper-heuristic based learning for hybrid flexible flowshop scheduling problem with sequence dependent setup times: a case study at a manufacturing plant (Q2664430)
From MaRDI portal
!
This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:
scientific article; zbMATH DE number 7335667
| Language | Label | Description | Also known as |
|---|---|---|---|
| default for all languages | No label defined |
||
| English | Iterated greedy algorithms enhanced by hyper-heuristic based learning for hybrid flexible flowshop scheduling problem with sequence dependent setup times: a case study at a manufacturing plant |
scientific article; zbMATH DE number 7335667 |
Statements
Iterated greedy algorithms enhanced by hyper-heuristic based learning for hybrid flexible flowshop scheduling problem with sequence dependent setup times: a case study at a manufacturing plant (English)
0 references
20 April 2021
0 references
hybrid flexible flowshop scheduling
0 references
iterated greedy search
0 references
hyper-heuristics
0 references
metaheuristics
0 references
0 references
0 references
0 references
0 references
0.8285439610481262
0 references
0.8102396130561829
0 references
0.8032932281494141
0 references
0.7988487482070923
0 references