Scheduling two-agents with a time-dependent deterioration to minimize the minsum earliness measures (Q2931176)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Scheduling two-agents with a time-dependent deterioration to minimize the minsum earliness measures |
scientific article; zbMATH DE number 6373500
| Language | Label | Description | Also known as |
|---|---|---|---|
| default for all languages | No label defined |
||
| English | Scheduling two-agents with a time-dependent deterioration to minimize the minsum earliness measures |
scientific article; zbMATH DE number 6373500 |
Statements
Scheduling Two-Agents with a Time-Dependent Deterioration to Minimize the Minsum Earliness Measures (English)
0 references
24 November 2014
0 references
scheduling
0 references
single-machine
0 references
two-agent
0 references
time-dependent deterioration
0 references
0 references
0 references
0 references
0 references
0 references
0.9279404282569884
0 references
0.8915079236030579
0 references
0.8846426010131836
0 references
0.8794021010398865
0 references
0.8710921406745911
0 references