A two-stage flow shop scheduling with a critical machine and batch availability (Q2978425)
From MaRDI portal
!
This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:
scientific article; zbMATH DE number 6707671
| Language | Label | Description | Also known as |
|---|---|---|---|
| default for all languages | No label defined |
||
| English | A two-stage flow shop scheduling with a critical machine and batch availability |
scientific article; zbMATH DE number 6707671 |
Statements
A two-stage flow shop scheduling with a critical machine and batch availability (English)
0 references
25 April 2017
0 references
batch scheduling
0 references
makespan
0 references
flowtime
0 references
total load
0 references
flowshop
0 references
critical machine
0 references
dynamic programming
0 references
heuristics
0 references
0 references
0 references
0.9297283
0 references
0.91744566
0 references
0.91626585
0 references
0.91580844
0 references
0.9132656
0 references
0.91182864
0 references
0.91029406
0 references
0.9086988
0 references
0.9081161
0 references