Due date assignment and single machine scheduling with deteriorating jobs to minimize the weighted number of tardy jobs (Q298499)

From MaRDI portal

!

This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:

scientific article; zbMATH DE number 6595650
Language Label Description Also known as
default for all languages
No label defined
    English
    Due date assignment and single machine scheduling with deteriorating jobs to minimize the weighted number of tardy jobs
    scientific article; zbMATH DE number 6595650

      Statements

      Due date assignment and single machine scheduling with deteriorating jobs to minimize the weighted number of tardy jobs (English)
      0 references
      0 references
      0 references
      0 references
      0 references
      0 references
      20 June 2016
      0 references
      scheduling
      0 references
      single-machine
      0 references
      deteriorating jobs
      0 references
      due date assignment
      0 references

      Identifiers