A Simulation-based Production Scheduling Method for Minimizing the Due-date-deviation (Q3146162)

From MaRDI portal

!

This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:

scientific article; zbMATH DE number 1799398
Language Label Description Also known as
default for all languages
No label defined
    English
    A Simulation-based Production Scheduling Method for Minimizing the Due-date-deviation
    scientific article; zbMATH DE number 1799398

      Statements

      A Simulation-based Production Scheduling Method for Minimizing the Due-date-deviation (English)
      0 references
      0 references
      0 references
      0 references
      4 November 2002
      0 references
      jop-shp scheduling
      0 references
      simulation
      0 references
      due-date-deviation
      0 references
      parameter space
      0 references
      backward simulation
      0 references
      backward/forward hybrid simulation
      0 references

      Identifiers