Bottleneck-based heuristics to minimize tardy jobs in a flexible flow line with unrelated parallel machines (Q3605446)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Bottleneck-based heuristics to minimize tardy jobs in a flexible flow line with unrelated parallel machines |
scientific article; zbMATH DE number 5510180
| Language | Label | Description | Also known as |
|---|---|---|---|
| default for all languages | No label defined |
||
| English | Bottleneck-based heuristics to minimize tardy jobs in a flexible flow line with unrelated parallel machines |
scientific article; zbMATH DE number 5510180 |
Statements
Bottleneck-based heuristics to minimize tardy jobs in a flexible flow line with unrelated parallel machines (English)
0 references
24 February 2009
0 references
bottleneck-based heuristics
0 references
flexible flow line
0 references
unrelated parallel machines
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0.8839641213417053
0 references
0.8420263528823853
0 references
0.8270435929298401
0 references
0.8182870745658875
0 references