Minimizing the makespan in a 2-machine flowshop with time lags and setup conditions (Q3677491)

From MaRDI portal

!

This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:

scientific article; zbMATH DE number 3898596
Language Label Description Also known as
default for all languages
No label defined
    English
    Minimizing the makespan in a 2-machine flowshop with time lags and setup conditions
    scientific article; zbMATH DE number 3898596

      Statements

      Minimizing the makespan in a 2-machine flowshop with time lags and setup conditions (English)
      0 references
      0 references
      0 references
      1984
      0 references
      two machine flowshop scheduling
      0 references
      time lags
      0 references
      setup times
      0 references
      makespan
      0 references

      Identifiers