Minimizing the makespan in a 2-machine flowshop with time lags and setup conditions (Q3677491)
From MaRDI portal
!
This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:
scientific article; zbMATH DE number 3898596
| Language | Label | Description | Also known as |
|---|---|---|---|
| default for all languages | No label defined |
||
| English | Minimizing the makespan in a 2-machine flowshop with time lags and setup conditions |
scientific article; zbMATH DE number 3898596 |
Statements
Minimizing the makespan in a 2-machine flowshop with time lags and setup conditions (English)
0 references
1984
0 references
two machine flowshop scheduling
0 references
time lags
0 references
setup times
0 references
makespan
0 references
0.8634653687477112
0 references
0.8584796786308289
0 references
0.8435249328613281
0 references
0.8330081105232239
0 references