Two-Stage Flowshop Scheduling Problem with Bicriteria (Q4022255)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Two-Stage Flowshop Scheduling Problem with Bicriteria |
scientific article; zbMATH DE number 97954
| Language | Label | Description | Also known as |
|---|---|---|---|
| default for all languages | No label defined |
||
| English | Two-Stage Flowshop Scheduling Problem with Bicriteria |
scientific article; zbMATH DE number 97954 |
Statements
Two-Stage Flowshop Scheduling Problem with Bicriteria (English)
0 references
17 January 1993
0 references
two-state flowshop scheduling
0 references
optimal makespan
0 references
branch-and-bound
0 references
heuristic
0 references
0.8992975950241089
0 references
0.8900820016860962
0 references
0.884138822555542
0 references
0.8723337650299072
0 references