Scheduling arc maintenance jobs in a network to maximize total flow over time (Q406493)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Scheduling arc maintenance jobs in a network to maximize total flow over time |
scientific article; zbMATH DE number 6341240
| Language | Label | Description | Also known as |
|---|---|---|---|
| default for all languages | No label defined |
||
| English | Scheduling arc maintenance jobs in a network to maximize total flow over time |
scientific article; zbMATH DE number 6341240 |
Statements
Scheduling arc maintenance jobs in a network to maximize total flow over time (English)
0 references
8 September 2014
0 references
network flows
0 references
scheduling
0 references
maintenance planning
0 references
local search
0 references
hybrid algorithms
0 references
0 references
0 references