Simultaneously determining the number of kanbans, container sizes, and the final-assembly sequence of products in a just-in-time shop. (Q4230046)
From MaRDI portal
!
This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:
scientific article; zbMATH DE number 1256413
| Language | Label | Description | Also known as |
|---|---|---|---|
| default for all languages | No label defined |
||
| English | Simultaneously determining the number of kanbans, container sizes, and the final-assembly sequence of products in a just-in-time shop. |
scientific article; zbMATH DE number 1256413 |
Statements
Simultaneously determining the number of kanbans, container sizes, and the final-assembly sequence of products in a just-in-time shop. (English)
0 references
1 March 1999
0 references
production planning
0 references
multiple-level, capacitated resource problem
0 references
just-in-time
0 references
economic lot scheduling
0 references
0 references
0 references
0.8287243247032166
0 references
0.8043310642242432
0 references
0.7954950928688049
0 references