Multi-objective flexible job shop scheduling method for machine tool component production line considering energy consumption and quality (Q5193895)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Multi-objective flexible job shop scheduling method for machine tool component production line considering energy consumption and quality |
scientific article; zbMATH DE number 7108379
| Language | Label | Description | Also known as |
|---|---|---|---|
| default for all languages | No label defined |
||
| English | Multi-objective flexible job shop scheduling method for machine tool component production line considering energy consumption and quality |
scientific article; zbMATH DE number 7108379 |
Statements
20 September 2019
0 references
flexible job shop scheduling
0 references
multi-objective optimization
0 references
similarity of intuitionistic fuzzy set
0 references
energy saving
0 references
heuristic rules
0 references
0.8100162744522095
0 references
0.7847490310668945
0 references
0.7816029787063599
0 references
0.7611947059631348
0 references
0.7607231140136719
0 references