Modified drum–buffer–rope scheduling mechanism for a non-identical parallel machine flow shop with processing-time variation (Q5485056)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Modified drum–buffer–rope scheduling mechanism for a non-identical parallel machine flow shop with processing-time variation |
scientific article; zbMATH DE number 5050360
| Language | Label | Description | Also known as |
|---|---|---|---|
| default for all languages | No label defined |
||
| English | Modified drum–buffer–rope scheduling mechanism for a non-identical parallel machine flow shop with processing-time variation |
scientific article; zbMATH DE number 5050360 |
Statements
Modified drum–buffer–rope scheduling mechanism for a non-identical parallel machine flow shop with processing-time variation (English)
0 references
28 August 2006
0 references
drum-buffer-rope (DBR)
0 references
theory of constraint
0 references
non-identical parallel machine
0 references
flow shop scheduling
0 references
finite capacity scheduling
0 references
0 references
0.7924917340278625
0 references
0.7826618552207947
0 references
0.7747613191604614
0 references
0.7276585102081299
0 references
0.7271024584770203
0 references