Minimizing the number of tardy jobs in the flowshop problem with operation and resource flexibility (Q732893)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Minimizing the number of tardy jobs in the flowshop problem with operation and resource flexibility |
scientific article; zbMATH DE number 5615436
| Language | Label | Description | Also known as |
|---|---|---|---|
| default for all languages | No label defined |
||
| English | Minimizing the number of tardy jobs in the flowshop problem with operation and resource flexibility |
scientific article; zbMATH DE number 5615436 |
Statements
Minimizing the number of tardy jobs in the flowshop problem with operation and resource flexibility (English)
0 references
15 October 2009
0 references
flowshop
0 references
scheduling
0 references
number of tardy jobs
0 references
operation assignment
0 references
simulated annealing
0 references
0 references
0 references
0 references
0 references
0 references
0.8183315992355347
0 references
0.8172171115875244
0 references
0.7940806150436401
0 references
0.7727075815200806
0 references
0.7689536213874817
0 references