Lexicographic solution of two-objective project planning problem under constrained reliability index
From MaRDI portal
Recommendations
- Minimization of project time and cost under constrained reliability index in the disjunctive project model
- Project planning with alternative technologies in uncertain environments
- Two uncertain chance-constrained programming models for time-cost trade-off problem
- scientific article; zbMATH DE number 1487565
- A two-stage stochastic programming approach for project planning with uncertain activity durations
Cites work
- A heuristic method for RCPSP with fuzzy activity times
- A two-step regularized linearization method for solving minimization problems.
- Critical-Path Planning and Scheduling: Mathematical Basis
- Cyclical games with prohibitions
- How real option disinvestment flexibility augments project NPV
- scientific article; zbMATH DE number 3846334 (Why is no real title available?)
- scientific article; zbMATH DE number 4070602 (Why is no real title available?)
- scientific article; zbMATH DE number 3748742 (Why is no real title available?)
- scientific article; zbMATH DE number 3787949 (Why is no real title available?)
- scientific article; zbMATH DE number 41702 (Why is no real title available?)
- scientific article; zbMATH DE number 3604646 (Why is no real title available?)
- scientific article; zbMATH DE number 3236597 (Why is no real title available?)
- Maximin dynamical probabilistic model of design control
- Method of fuzzy critical path for network planning and control over projects based on soft computations
- Optimization of schedules with precedence logical conditions
- Regularized linearization method with errors in the initial data
- Regularized proximal method for minimization problems with inaccurate initial data
- Volatility estimation for stochastic project value models
Cited in
(4)- The cross-impact analysis of innovative projects in a portfolio
- Selection of priority areas in research and development
- The quantitative analysis of project objective flexible control based on entropy
- Minimization of project time and cost under constrained reliability index in the disjunctive project model
This page was built for publication: Lexicographic solution of two-objective project planning problem under constrained reliability index
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q895303)