Mean completion time for a randomly varying rate of work
From MaRDI portal
Recommendations
- Computation of the distribution of the completion time when the work requirement is a ph random variableThis work was supported in part by the US Office of Naval Research under Contract no. N3014-88-K-0623, by NASA under Grant NAG-1-70, and by the Italian National Research Council CNR under the project “Material and Devices for Solid State Electronics” Grant no. 86.02177.61.
- A lower bound for weighted completion time variance
- Estimating Time Averages via Randomly-Spaced Observations
- scientific article; zbMATH DE number 1559454
- On the completion time of a job processed on an unreliable machine
- Minimizing the average deviation of job completion times about a common due date
- Minimizing mean absolute deviation of completion times about a common due date
- The completion time of a job on multimode systems
- Minimizing weighted mean absolute deviation of job completion times from their weighted mean
Cites work
- Aesop's moral on success
- An introduction to differential equations. Vol. 2. Stochastic modeling, methods, and analysis.
- Construction of Equivalent Stochastic Differential Equation Models
- Environmental variability and mean-reverting processes
- First passage time statistics of Brownian motion with purely time dependent drift and diffusion
- scientific article; zbMATH DE number 5946386 (Why is no real title available?)
- Numerical solution of SDE through computer experiments. Including floppy disk
- Stationary Analysis of a Fluid Queue with Input Rate Varying as an Ornstein–Uhlenbeck Process
- Stochastic modelling of environmental variation for biological populations
This page was built for publication: Mean completion time for a randomly varying rate of work
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3383681)