Minimum control charts
From MaRDI portal
Recommendations
Cites work
- scientific article; zbMATH DE number 3178145 (Why is no real title available?)
- scientific article; zbMATH DE number 1052821 (Why is no real title available?)
- Alternative Shewhart-type charts for grouped observations
- Are estimated control charts in control?
- Data driven choice of control charts
- Empirical Non-Parametric Control Charts: Estimation Effects and Corrections
- Estimation in Shewhart control charts: effects and corrections.
- Exceedance probabilities for parametric control charts
- Parametric control charts
- Robustness of mean E(X) and R charts
- Run length, average run length and false alarm rate of shewhart x-bar chart: exact derivations by conditioning
- Shewhart x-charts with estimated process variance
- Shewhart-Type Charts in Nonstandard Situations
Cited in
(14)- Empirical Non-Parametric Control Charts: Estimation Effects and Corrections
- Nonparametric control charts based on runs and Wilcoxon-type rank-sum statistics
- Distribution-free precedence control charts with improved runs-rules
- Normal control charts with nonparametric safeguard
- Shewhart Control Charts in New Perspective
- Distribution-free precedence schemes with a generalized runs-rule for monitoring unknown location
- One-sided precedence monitoring schemes for unknown shift sizes using generalized 2-of-(h+1) and w-of-w improved runs-rules
- scientific article; zbMATH DE number 18934 (Why is no real title available?)
- CUMIN charts
- Empirical nonparametric control charts for high-quality processes
- The optimal choice of negative binomial charts for monitoring high-quality processes
- Improved data driven control charts
- MINDCUMIN charts
- Two nonparametric predictive control charts
This page was built for publication: Minimum control charts
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2475739)