Mip-based local search for permutation flowshop scheduling with makespan objective
From MaRDI portal
Cites work
- A best-of-breed iterated greedy for the permutation flowshop scheduling problem with makespan objective
- A branch-and-bound-based local search method for the flow shop problem
- A comprehensive review and evaluation of permutation flowshop heuristics
- A computationally efficient branch-and-bound algorithm for the permutation flow-shop scheduling problem
- A matheuristic approach for the two-machine total completion time flow shop problem
- A new vision of approximate methods for the permutation flowshop to minimise makespan: state-of-the-art and computational evaluation
- A note on permutation flow shop problem
- A reduced variable neighborhood search for the just in time job shop scheduling problem with sequence dependent setup times
- A review and classification of heuristics for permutation flow-shop scheduling with makespan objective
- A systematic review of permutation flow shop scheduling with due-date-related objectives
- A very fast tabu search algorithm for the permutation flow shop problem with makespan criterion
- An improved NEH-based heuristic for the permutation flowshop problem
- An iterated greedy algorithm with optimization of partial solutions for the makespan permutation flowshop problem
- Automatic design of hybrid stochastic local search algorithms for permutation flowshop problems
- Benchmarks for basic scheduling problems
- Comparative evaluation of MILP flowshop models
- Comparison of heuristics for flowtime minimisation in permutation flowshops
- scientific article; zbMATH DE number 3550182 (Why is no real title available?)
- Matheuristics. Algorithms and implementations
- Minimising total tardiness in the \(m\)-machine flowshop problem: A review and evaluation of heuristics and metaheuristics
- New hard benchmark for flowshop scheduling problems minimising makespan
- On some lower bounds for the permutation flowshop problem
- Optimal two- and three-stage production schedules with set-up time included
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Some efficient heuristic methods for the flow shop sequencing problem
- Tight bounds for permutation flow shop scheduling
This page was built for publication: Mip-based local search for permutation flowshop scheduling with makespan objective
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6855216)