Mixed integer programming for scheduling surface mount technology lines
From MaRDI portal
Recommendations
- Optimal versus heuristic scheduling of surface mount technology lines
- scientific article; zbMATH DE number 2095932
- Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers
- An exact approach for batch scheduling in flexible flow lines with limited intermediate buffers.
- SMT production scheduling: a generalized transportation approach
Cited in
(14)- An exact approach for batch scheduling in flexible flow lines with limited intermediate buffers.
- Loading and scheduling of a flexible assembly system by mixed integer programming.
- Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers
- Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line
- The hybrid flow shop scheduling problem
- Optimal versus heuristic scheduling of surface mount technology lines
- An integer programming application to solve sequencer mix problems in printed circuit board production
- SMT production scheduling: a generalized transportation approach
- scientific article; zbMATH DE number 1935514 (Why is no real title available?)
- scientific article; zbMATH DE number 2095932 (Why is no real title available?)
- Mixed integer programming approaches to planning and scheduling in electronics supply chains
- Scheduling of modular production lines in mobile terminal manufacturing using MILP
- Feasible insertions in job shop scheduling, short cycles and stable sets
- A memetic algorithm for the flexible flow line scheduling problem with processor blocking
This page was built for publication: Mixed integer programming for scheduling surface mount technology lines
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4679971)