Modelling and solving the production rate variation problem (PRVP)
From MaRDI portal
Recommendations
- Solving the minmax product rate variation problem (PRVP) as a bottleneck assignment problem
- The product rate variation problem and its relevance in real world mixed-model assembly lines
- A Note on the Relation between the Product Rate Variation (PRV) Problem and the Apportionment Problem
- Improved upper bound to product rate variation problem
- A relationship between the assignment and the perfect matching approaches for the product rate variation problem with a general objective
Cites work
- A dynamic programming algorithm for scheduling mixed-model, just-in-time production systems
- A Note on “Level Schedules for Mixed-Model Assembly Lines in Just-in-Time Production Systems”
- A simple sequencing algorithm for mixed-model assembly lines in just-in- time production systems
- Developing production schedules which balance part usage and smooth production loads for just-in-time production systems
- Heuristics and exact algorithms for solving the Monden problem
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems
- Level Schedules for Mixed-Model, Just-in-Time Processes
- Minimizing variation of production rates in just-in-time systems: A survey
- Note—Sequencing JIT Mixed-Model Assembly Lines
- One-Processor Scheduling with Symmetric Earliness and Tardiness Penalties
Cited in
(15)- The product rate variation problem and its relevance in real world mixed-model assembly lines
- Mathematical programming modeling of the response time variability problem
- Optimum manpower models for a production system with varying production rates
- A simple approach to the product rate variation problem via axiomatics
- A branch and bound algorithm for the response time variability problem
- Solving the minmax product rate variation problem (PRVP) as a bottleneck assignment problem
- Output rate variation problem: some heuristic paradigms and dynamic programming
- scientific article; zbMATH DE number 3874947 (Why is no real title available?)
- scientific article; zbMATH DE number 4209893 (Why is no real title available?)
- Improved upper bound to product rate variation problem
- Bottleneck product rate variation problem with absolute-deviation objective
- A relationship between the assignment and the perfect matching approaches for the product rate variation problem with a general objective
- A Note on the Relation between the Product Rate Variation (PRV) Problem and the Apportionment Problem
- Solving the generalized apportionment problem through the optimization of discrepancy functions
- Response time variability
This page was built for publication: Modelling and solving the production rate variation problem (PRVP)
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1383316)