Modified inertial projection algorithm for multiple-sets split feasibility problems
From MaRDI portal
Cites work
- A multiprojection algorithm using Bregman projections in a product space
- A new halfspace-relaxation projection method for the split feasibility problem
- A new simultaneous subgradient projection algorithm for solving a multiple-sets split feasibility problem.
- A note on the CQ algorithm for the split feasibility problem
- A relaxed self-adaptive CQ algorithm for the multiple-sets split feasibility problem
- A self-adaptive projection method for solving the multiple-sets split feasibility problem
- A single projection algorithm with double inertial extrapolation steps for solving pseudomonotone variational inequalities in Hilbert space
- An inertial self-adaptive iterative algorithm for finding the common solutions to split feasibility and fixed point problems in specific Banach spaces
- Convex analysis and monotone operator theory in Hilbert spaces
- Gradient methods with selection technique for the multiple-sets split feasibility problem
- Inertial algorithm with self-adaptive step size for split common null point and common fixed point problems for multivalued mappings in Banach spaces
- Inertial-based extragradient algorithm for approximating a common solution of split-equilibrium problems and fixed-point problems of nonexpansive semigroups
- Iterative methods for solving the multiple-sets split feasibility problem with splitting self-adaptive step size
- Iterative oblique projection onto convex sets and the split feasibility problem
- Perturbed projections and subgradient projections for the multiple-sets split feasibility problem
- Some methods of speeding up the convergence of iteration methods
- The multiple-sets split feasibility problem and its applications for inverse problems
- Weak Convergence of a Relaxed and Inertial Hybrid Projection-Proximal Point Algorithm for Maximal Monotone Operators in Hilbert Space
This page was built for publication: Modified inertial projection algorithm for multiple-sets split feasibility problems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q7005534)