Multi-degree cyclic flow shop robotic cell scheduling problem: ant colony optimization
From MaRDI portal
Recommendations
- Cyclic scheduling of parts and robot moves in \(m\)-machine robotic cells
- Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots
- A scheduling problem in blocking hybrid flow shop robotic cells with multiple robots
- An improved algorithm for cyclic flowshop scheduling in a robotic cell
- Cyclic scheduling in a robotic production line
Cites work
- scientific article; zbMATH DE number 3497315 (Why is no real title available?)
- A mixed integer programming approach for multi-cyclic robotic flowshop scheduling with time window constraints
- A polynomial algorithm for 2-cyclic robotic scheduling: A non-Euclidean case
- A polynomial algorithm for multi-robot 2-cyclic scheduling in a no-wait robotic cell
- A polynomial algorithm for scheduling small-scale manufacturing cells served by multiple robots
- A scheduling problem in blocking hybrid flow shop robotic cells with multiple robots
- An Efficient Optimal Solution to the Two-Hoist No-Wait Cyclic Scheduling Problem
- An efficient algorithm for multi-hoist cyclic scheduling with fixed processing times
- An exact optimal cyclic scheduling algorithm for multioperator service of a production line
- An improved algorithm for cyclic flowshop scheduling in a robotic cell
- Approximation algorithms for \(k\)-unit cyclic solutions in robotic cells
- Complexity of one-cycle robotic flow-shops
- Cyclic Scheduling of Identical Parts in a Robotic Cell
- Cyclic multiple-robot scheduling with time-window constraints using a critical path approach
- Cyclic scheduling in robotic flowshops
- Minimal quantity of operators for serving a homogeneous linear technological process
- Minimizing total weighted completion time approximately for the parallel machine problem with a single server
- Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots
- Robust optimization for the cyclic hoist scheduling problem
- Scheduling no-wait robotic cells with two and three machines
- Sequencing and scheduling in robotic cells: recent developments
- Sequencing of robot activities and parts in two-machine robotic cells
- Throughput optimization in robotic cells
Cited in
(9)- Graph coloring approaches for a production planning problem with makespan and setup penalties in a product-wheel context
- Nash-equilibrium algorithm and incentive protocol for a decentralized decision and scheduling problem in sustainable electroplating plants
- Static force capability optimization of humanoids robots based on modified self-adaptive differential evolution
- A dynamic scheduling approach for optimizing the material handling operations in a robotic cell
- An improved algorithm for cyclic flowshop scheduling in a robotic cell
- Cyclic scheduling of parts and robot moves in \(m\)-machine robotic cells
- A scheduling problem in blocking hybrid flow shop robotic cells with multiple robots
- Schedule-allocate and robust sequencing in three-machine robotic cell under breakdowns
- A hybrid metaheuristic algorithm to optimise a real-world robotic cell
This page was built for publication: Multi-degree cyclic flow shop robotic cell scheduling problem: ant colony optimization
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q342414)