Multi-objective approaches for the open-pit mining operational planning problem
From MaRDI portal
Recommendations
- A hybrid heuristic algorithm for the open-pit-mining operational planning problem
- The Problem Of Production Planning In Open Pit Mines
- Comparative analysis of three metaheuristics for short-term open pit block sequencing
- Multi-objective short-term production scheduling for open-pit mines: a hierarchical decomposition-based algorithm
- Network-flow based algorithms for scheduling production in multi-processor open-pit mines accounting for metal uncertainty
Cites work
Cited in
(12)- Robust planning for an open-pit mining problem under ore-grade uncertainty
- Multi-objective short-term production scheduling for open-pit mines: a hierarchical decomposition-based algorithm
- PLANNING RELOCATION OF PEOPLE FOR DEVELOPING SURFACE MINES IN DENSELY POPULATED AREAS: OPTIMIZATION OF MULTIPLE OBJECTIVES
- Layout optimization of crushing station in open-pit mine based on two-stage fusion particle swarm algorithm
- Lexicographic goal programming approach for a short-term mining planning problem
- Optimization of open-pit mine design and production planning with an improved floating cone algorithm
- Optimizing mining complexes with multiple processing and transportation alternatives: an uncertainty-based approach
- An ILS-based algorithm to solve a large-scale real heterogeneous fleet VRP with multi-trips and docking constraints
- Calibration of a type 2 controller applied to a buck converter: a multi-objective analysis
- Efficient algorithms of pathwise dynamic programming for decision optimization in mining operations
- A hybrid heuristic algorithm for the open-pit-mining operational planning problem
- A NEW FUZZY MULTI CRITERIA DECISION MAKING MODEL FOR OPEN PIT MINES EQUIPMENT SELECTION
This page was built for publication: Multi-objective approaches for the open-pit mining operational planning problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2840780)