Multi-period optimal defective production problem with variable preparation time
From MaRDI portal
Recommendations
- Multi-item multi-period optimal production problem with variable preparation time in fuzzy stochastic environment
- Optimal production inventory policy for defective items with fuzzy time period
- Optimal production inventory problem in imprecise time period
- Integrated production inventory model with variable production rate on quality of products involving probabilistic defective under variable setup cost
- Numerical approach to an optimal multi-item imperfect production control problem in uncertain environment
Cites work
- scientific article; zbMATH DE number 193123 (Why is no real title available?)
- A class of fuzzy random optimization: Expected value models.
- A note on an inventory model with stock-dependent consumption rate
- A note on chance constrained programming with fuzzy coefficients
- A production-recycling-inventory system with imprecise holding costs
- Chance constrained programming with fuzzy parameters
- Fuzzy inventory model with two warehouses under possibility constraints
- Fuzzy random variables
- Fuzzy random variables - I. Definitions and theorems
- Multi-item multi-period optimal production problem with variable preparation time in fuzzy stochastic environment
- Multiproduct production/inventory control under random demands
- Optimal control for systems with deterministic production cycles
- Optimal control of a marketing-production system
- Optimal control of production and remanufacturing in a simple recovery model with linear cost functions
- Optimal production control in a discrete manufacturing system with unreliable machines and random demands
- Order level inventory system with power demand pattern for items with variable rate of deterioration
- PRODUCTION–INVENTORY MODEL FOR A DETERIORATING ITEM WITH IMPRECISE PREPARATION TIME FOR PRODUCTION IN A FINITE TIME HORIZON
- The \(\lambda\)-average value and the fuzzy expectation of a fuzzy random variable
Cited in
(1)
This page was built for publication: Multi-period optimal defective production problem with variable preparation time
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q505119)