Multimode time-cost-robustness trade-off project scheduling problem under uncertainty
From MaRDI portal
Recommendations
- Robust scheduling and robustness measures for the discrete time/cost trade-off problem
- Multi-mode bi-objective proactive project scheduling optimization considering robust cost
- A hybrid simulation-optimization approach for the robust discrete time/cost trade-off problem
- A robust optimization approach for the multi-mode resource-constrained project scheduling problem
- Robust optimization models for project scheduling with resource availability cost
Cites work
- A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
- A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem
- A hybrid simulation-optimization approach for the robust discrete time/cost trade-off problem
- A linear time-cost tradeoff problem with multiple milestones under a comb graph
- A path-relinking algorithm for the multi-mode resource-constrained project scheduling problem
- An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances
- Approximation algorithms for the discrete time-cost tradeoff problem
- Best routes selection in multimodal networks using multi-objective genetic algorithm
- Complexity results for the linear time-cost tradeoff problem with multiple milestones and completely ordered jobs
- Critical Path Problems with Concave Cost-Time Curves
- Discrete time/cost trade-off problem: a decomposition-based solution algorithm for the budget version
- Effective implementation of the \(\varepsilon \)-constraint method in multi-objective mathematical programming problems
- Lawler's minmax cost problem under uncertainty
- Multi-mode resource constrained multi-project scheduling and resource portfolio problem
- Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
- Multi-objective metaheuristic algorithms for the resource-constrained project scheduling problem with precedence relations
- Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach
- Network decomposition-based benchmark results for the discrete time-cost tradeoff problem
- New concepts for activity float in resource-constrained project management
- Note—A Note on “A Simple CPM Time-Cost Tradeoff Algorithm”
- Optimal procedures for the discrete time/cost trade-off problem in project networks
- PSPLIB -- a project scheduling problem library
- Pareto simulated annealing—a metaheuristic technique for multiple‐objective combinatorial optimization
- Project scheduling under uncertainty: survey and research potentials
- Project scheduling with finite or infinite number of activity processing modes -- a survey
- Project scheduling with multiple modes: A genetic algorithm
- Real-time scheduling optimization considering the unexpected events in home health care
- Recoverable robust timetabling for single delay: Complexity and polynomial algorithms for special cases
- Robust scheduling and robustness measures for the discrete time/cost trade-off problem
- Scheduling subject to resource constraints: Classification and complexity
- The discrete time-cost tradeoff problem revisited
- The discrete time/cost trade-off problem: Extensions and heuristic procedures
- Two Approaches to Problems of Resource Allocation among Project Activities -- A Comparative Study
- Variable neighbourhood search and tabu search for a discrete time/cost trade-off problem to minimize the maximal cash flow gap
Cited in
(13)- Robust optimization models for project scheduling with resource availability cost
- The bi-criterial approach to project cost and schedule buffers sizing
- A hybrid simulation-optimization approach for the robust discrete time/cost trade-off problem
- The stochastic time–cost tradeoff problem: A robust optimization approach
- Activity couple with interdependent durations: serial, parallel or partly overlapping scheduling?
- Bi-objective multi-mode project scheduling under risk aversion
- Generating a robust baseline schedule for the robust discrete time/resource trade-off problem under work content uncertainty
- Robust solutions for the software project scheduling problem: a preliminary analysis
- Robust scheduling and robustness measures for the discrete time/cost trade-off problem
- Robust proactive project scheduling model for the stochastic discrete time/cost trade-off problem
- A robust optimization approach for the multi-mode resource-constrained project scheduling problem
- Multi-mode bi-objective proactive project scheduling optimization considering robust cost
- Scheduling multi-mode projects under uncertainty to optimize cash flows: a Monte Carlo ant colony system approach
This page was built for publication: Multimode time-cost-robustness trade-off project scheduling problem under uncertainty