Network scheduling techniques for construction project management
The book is devoted to project network scheduling in industrial, financial and commercial organizators. The scheduling procedures presented are mainly based on deterministic network techniques. Special emphasis is given to the precedence diagramming method (PDM), currently used in the majority of the industrial applications. Apart from the classic PDM method, new methodological improvements of PDM are presented, e.g. generalized (so called maximal) type of constraints and time-cost trade-off considerations. A PC-based software package called ProjectDirector implementing the advanced material of the book is available from the author.
- Scheduling of project networks
- scientific article; zbMATH DE number 2144388
- scientific article; zbMATH DE number 4135692
- Network construction problems with due dates
- Task Scheduling in Networks
- Integrated scheduling and batch ordering for construction project
- A network flow algorithm for just-in-time project scheduling
- scientific article; zbMATH DE number 4023002
- Project scheduling with generalized precedence relations: a new method to analyze criticalities and flexibilities
- Network construction problems with due dates
- scientific article; zbMATH DE number 4031387 (Why is no real title available?)
- Critical activity analysis in precedence diagram method scheduling network
- Preprocessing the discrete time-cost tradeoff problem with generalized precedence relations
- An influence matrix for project expediting
This page was built for publication: Network scheduling techniques for construction project management
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1374467)