No-wait scheduling problems with batching machines
From MaRDI portal
Recommendations
Cites work
- Batch sizing and job sequencing on a single machine
- Dynamic scheduling on a single batch processing machine with split compatibility graphs
- Flowshop scheduling problem with a batching machine and task compatibilities
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- scientific article; zbMATH DE number 866105 (Why is no real title available?)
- Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity
- Minimizing mean completion time in a batch processing system
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Paths, Trees, and Flowers
- Scheduling a batching machine
- Scheduling batches with sequential job processing for two-machine flow and open shops
- Scheduling batches with simultaneous job processing for two-machine shop problems
- Scheduling Groups of Jobs on a Single Machine
- Scheduling hybrid flowshop with parallel batching machines and compatibilities
- Scheduling on a batch machine with job compatibilities
- Scheduling with batching: A review
- Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem
- The complexity of one-machine batching problems
- Weighted coloring on planar, bipartite and split graphs: Complexity and approximation
Cited in
(3)
This page was built for publication: No-wait scheduling problems with batching machines
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2958672)