Nonstrict vector summation in multi-operation scheduling
From MaRDI portal
Recommendations
Cited in
(10)- Nonstrict summation of vectors on the plane and its application to scheduling problems
- The flow shop problem with no-idle constraints: a review and approximation
- Vector Summation in Banach Space and Polynomial Algorithms for Flow Shops and Open Shops
- scientific article; zbMATH DE number 808808 (Why is no real title available?)
- The three-machine proportionate open shop and mixed shop minimum makespan problems
- Complexity and approximation of open shop scheduling to minimize the makespan: a review of models and approaches
- Four decades of research on the open-shop scheduling problem to minimize the makespan
- Open block scheduling in optical communication networks
- Some positive news on the proportionate open shop problem
- On some properties of optimal schedules in the job shop problem with preemption and an arbitrary regular criterion
This page was built for publication: Nonstrict vector summation in multi-operation scheduling
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1273125)