On the parameterized complexity of interval scheduling with eligible machine sets
From MaRDI portal
Cites work
- A parameterized complexity view on non-preemptively scheduling interval-constrained jobs: few machines, small looseness, and small slack
- A quadratic time algorithm to maximize the number of just-in-time jobs on identical parallel machines
- A simplified NP-complete satisfiability problem
- Algorithmic Aspects of Vertex Elimination on Graphs
- Fixed interval scheduling: models, applications, computational complexity and algorithms
- Inductive \(k\)-independent graphs and \(c\)-colorable subgraphs in scheduling: a review
- Interval scheduling on identical machines
- Interval scheduling on related machines
- Interval scheduling: A survey
- Just-in-time scheduling with controllable processing times on parallel machines
- Maximizing weighted number of just-in-time jobs on unrelated parallel machines
- On the \(k\)-coloring of intervals
- On the approximability of an interval scheduling problem
- On the complexity of k-SAT
- On the parameterized complexity of multiple-interval graph problems
- Optimal interval scheduling with a resource constraint
- Parameterized complexity of machine scheduling: 15 open problems
- Precoloring extension on unit interval graphs
- Precoloring extension. I: Interval graphs
- Scheduling jobs with fixed start and end times
- Scheduling of parallel identical machines to maximize the weighted number of just-in-time jobs
- Sequencing with Earliness and Tardiness Penalties: A Review
- Single machine scheduling to minimize the number of early and tardy jobs
- The intersection graphs of subtrees in trees are exactly the chordal graphs
- The just-in-time scheduling problem in a flow-shop scheduling system
- The maximum k-colorable subgraph problem for chordal graphs
- Which problems have strongly exponential complexity?
Cited in
(5)- Fair repetitive interval scheduling
- Moderate exponential-time algorithms for scheduling problems
- Single-machine scheduling to minimize the number of tardy jobs with release dates
- Just-in-time scheduling in two-stage flexible flow shops
- Minimizing the number of tardy jobs with uniform processing times on parallel machines
This page was built for publication: On the parameterized complexity of interval scheduling with eligible machine sets
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6564614)