On track procession assignment problem at the railway network sections
From MaRDI portal
Recommendations
- On time selection for track possession assignment at the railway station
- Solving railway track allocation problems
- Models for railway track allocation
- Scheduling of railway track maintenance activities and crews
- Graph methods for solving the unconstrained and constrained optimal assignment problem for locomotives on a single-line railway section
Cites work
- A survey of optimization models for train routing and scheduling
- Locomotive assignment with heterogeneous consists at CN North America
- Modelling railway freight traffic using the methods of graph theory and combinatorial optimization
- On time selection for track possession assignment at the railway station
- Rescheduling rail networks with maintenance disruptions using problem space search
- Scheduling the two-way traffic on a single-track railway with a siding
Cited in
(8)- On the algorithm of cargoes transportation scheduling in the transport network
- Graph methods for solving the unconstrained and constrained optimal assignment problem for locomotives on a single-line railway section
- On the online track assignment problem
- Scheduling of railway track maintenance activities and crews
- On time selection for track possession assignment at the railway station
- Linear integer programming model as mathematical ware for an optimal flow production planning system at operational scheduling stage
- On the general problem statement of cargo carriages scheduling and ways to solve it
- On the Scheduling Problem of Cargo Transportation on a Railway Network Segment and Algorithms for Its Solution
This page was built for publication: On track procession assignment problem at the railway network sections
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q828065)