Optimal Scheduiing of Two Consecutive Idle Periods
From MaRDI portal
Cited in
(11)- Optimum manpower models for a production system with varying production rates
- Enhancing an algorithm for set covering problems
- An efficient two-phase algorithm for cyclic days-off scheduling.
- Staff scheduling at the United States postal Service
- A cyclic integer covering problem
- A resource type analysis of the integrated project scheduling and personnel staffing problem
- Using compressed workweeks to save labour cost
- A class of manpower scheduling problems
- A 4-DAY OR A 3-DAY WORKWEEKS SCHEDULING PROBLEM WITH A GIVEN WORKFORCE SIZE
- The cyclical scheduling problem
- A survey of dynamic network flows
This page was built for publication: Optimal Scheduiing of Two Consecutive Idle Periods
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5653784)