Optimal control of a two-server flow-shop network
From MaRDI portal
Recommendations
Cites work
- scientific article; zbMATH DE number 3550182 (Why is no real title available?)
- scientific article; zbMATH DE number 1734433 (Why is no real title available?)
- scientific article; zbMATH DE number 1095138 (Why is no real title available?)
- scientific article; zbMATH DE number 786521 (Why is no real title available?)
- scientific article; zbMATH DE number 3313067 (Why is no real title available?)
- A 3/2-approximation algorithm for two-machine flow-shop sequencing subject to release dates.
- A New Algorithm for State-Constrained Separated Continuous Linear Programs
- A Polynomial Approximation Scheme for a Constrained Flow-Shop Scheduling Problem
- A fluid approach to large volume job shop scheduling
- A survey on problems and methods in generalized assembly line balancing
- An Algorithm for a Class of Continuous Linear Programs
- Analysis of Heuristics for Two-Machine Flow-Shop Sequencing Subject to Release Dates
- Approximability of flow shop scheduling
- Asymptotic analysis of an on-line algorithm for the single machine completion time problem with release dates
- Asymptotically Optimal Algorithms for Job Shop Scheduling and Packet Routing
- Control Techniques for Complex Networks
- Dynamic Scheduling of a Multiclass Fluid Network
- Dynamic scheduling with convex delay costs: The generalized \(c\mu\) rule
- Forms of Optimal Solutions for Separated Continuous Linear Programs
- From fluid relaxations to practical algorithms for job shop scheduling: The makespan objective
- Minimizing makespan in a two-machine flow shop with delays and unit-time operations is NP-hard
- Minimum Flow Time in a Tandem Two-Server Fluid Network
- On the Solutions of a Class of Continuous Linear Programs
- Optimal Strategies for Priority Queues with Nonlinear Costs of Delay
- Optimal flow control in manufacturing systems. Production planning and scheduling. Incl. 1 disk
- Optimal two- and three-stage production schedules with set-up time included
- Planning and Scheduling in Manufacturing and Services
- Scheduling. Theory, algorithms, and systems.
- Stability conditions for multiclass fluid queueing networks
Cited in
(2)
This page was built for publication: Optimal control of a two-server flow-shop network
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q892910)