Optimal lot sizing with regular maintenance interruptions
From MaRDI portal
Recommendations
- Optimal JIT safety stock and buffer inventory for minimal repair and regular preventive maintenance
- Process quality adjusted lot sizing and marketing interface in JIT environment
- Optimal lot-sizing problem with imperfect maintenance and imperfect production
- Production Lot Sizing with Machine Breakdowns
- An inventory model for interrupted multi-stage production
Cites work
- A Condition Based Maintenance Model with Exponential Failures and Fixed Inspection Intervals
- A Preventive Replacement Policy for Units Subject to Intermittent Demand
- Investing in Reduced Setups in the EOQ Model
- Lot sizes and setup frequency with learning in setups and process quality
- Lot Sizes, Lead Times and In-Process Inventories
- Maintenance optimization of a production system with buffer capacity
- Production Batching with Machine Breakdowns and Safety Stocks
- Production breaks and the learning curve: The forgetting phenomenon
- Production lot sizing under setup and worker learning
- Production Lot Sizing with Machine Breakdowns
Cited in
(8)- Letter to the editor (with reply) by Moueen Salameh: Optimal lot sizing with regular maintenance interruptions
- Considering human error in optimizing production and corrective and preventive maintenance policies for manufacturing systems
- Determining an optimal production run length with an extended quality control policy for an imperfect process
- Process quality adjusted lot sizing and marketing interface in JIT environment
- Economic production quantity with the presence of imperfect quality and random machine breakdown and repair based on the artificial bee colony heuristic
- Group maintenance scheduling for two-component systems with failure interaction
- Optimal JIT safety stock and buffer inventory for minimal repair and regular preventive maintenance
- Simultaneous optimization of inventory, maintenance, and quality for production systems subject to multiple mean and variance shifts
This page was built for publication: Optimal lot sizing with regular maintenance interruptions
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1364634)