Optimal replacement with a single unloaded standby
From MaRDI portal
Recommendations
- Replacement problems for a cold standby repairable system
- Optimal replacement policy based on the number of down times
- An optimal replacement policy for repairable cold standby system with priority in use
- scientific article; zbMATH DE number 4160447
- Maintenance and replacement model for cold standby repairable system
Cited in
(10)- Optimum Markov replacement policies for using the most reliable components
- Defining line replaceable units
- scientific article; zbMATH DE number 4160447 (Why is no real title available?)
- Replacing nonidentical vital components to extend system life
- Optimal replacement policy for general parallel reliability system
- A replacement policy maximizing MTTF of a system with several spare units
- Optimal Dynamic Opportunistic Replacement with Random Resupply of Spare Parts
- Inspection times for stand-by units
- A cast-off replacement policy for a component demanded by two parallel units
- Analysis and computation of (n,N)-strategies for maintenance of a two- component system
This page was built for publication: Optimal replacement with a single unloaded standby
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5187054)