Optimal scheduling of multi-load autonomous guided vehicles using mixed integer programming
From MaRDI portal
Recommendations
- AGV scheduling optimization in mixed flexible manufacturing cell
- Multi-AGV dispatching and routing problem based on a three-stage decomposition method
- An effective population-based iterated greedy algorithm for solving the multi-AGV scheduling problem with unloading safety detection
- Integration of AI and OR Techniques in Constraint Programming for Combinatorial Optimization Problems
- Scheduling multiple types of equipment in an automated warehouse
This page was built for publication: Optimal scheduling of multi-load autonomous guided vehicles using mixed integer programming
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6577930)