Optimization of maintenance and spare provisioning policy using simulation
From MaRDI portal
Recommendations
- Jointly Optimal Block-Replacement and Spare Provisioning Policy
- A fixed interval ordering policy for joint optimization of age replacement and spare part provisioning
- The joint optimization of the production system overhaul interval and the procurement of the key spare parts inventory
- Failure replacement and preventive maintenance spare parts ordering policy
- A stochastic model for joint spare parts inventory and planned maintenance optimisation
Cites work
Cited in
(20)- Joint maintenance and spare component provisioning policy for \(k\)-out-of-\(n\) systems
- Joint optimization of condition-based opportunistic maintenance and spare parts provisioning policy in multiunit systems
- A hybrid simulation-based optimization framework supporting strategic maintenance development to improve production performance
- A stochastic model for joint spare parts inventory and planned maintenance optimisation
- Analysis of joint maintenance and production policies under a subcontracting constraint
- OR in spare parts management: a review
- Agent-based product-support logistics system using XML and RDF
- Simulation study for the optimal repair capacity of an IT maintenance center based on LRD failure distribution
- The value of maintenance delay flexibility for improved spare parts inventory management
- A condition-based order-replacement policy for a single-unit system
- scientific article; zbMATH DE number 770197 (Why is no real title available?)
- Joint optimization of spare parts ordering and maintenance policies for multiple identical items subject to silent failures
- scientific article; zbMATH DE number 5578198 (Why is no real title available?)
- Simulation study of a bottleneck-based dispatching policy for a maintenance workforce
- A condition-based replacement and spare provisioning policy for deteriorating systems with uncertain deterioration to failure
- A decomposition method by interaction prediction for the optimization of maintenance scheduling
- Joint optimization of maintenance, buffer, and spare parts for a production system
- Simultaneous predictive maintenance and inventory policy in a continuously monitoring system using simulation optimization
- Jointly Optimal Block-Replacement and Spare Provisioning Policy
- The joint optimization of the production system overhaul interval and the procurement of the key spare parts inventory
This page was built for publication: Optimization of maintenance and spare provisioning policy using simulation
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1591109)