Publication | Date of Publication | Type |
---|
Efficient algorithms for flexible job shop scheduling with parallel machines | 2023-10-09 | Paper |
Sustainability Planning for Healthcare Information Exchanges with Supplier Rebate Program | 2020-11-04 | Paper |
Supply planning models for a remanufacturer under just-in-time manufacturing environment with reverse logistics | 2017-03-03 | Paper |
Structural Search and Optimization in Social Networks | 2016-06-29 | Paper |
Coordination in a two-stage production system: complexity, conflict and cooperation | 2012-11-15 | Paper |
Balancing perfectly periodic service schedules: An application from recycling and waste management | 2012-10-15 | Paper |
The Integrated Production and Transportation Scheduling Problem for a Product with a Short Lifespan | 2012-07-28 | Paper |
A Traffic-Grooming Algorithm for Wavelength-Routed Optical Networks | 2012-06-18 | Paper |
Quantifying the Impact of Layout on Productivity: An Analysis from Robotic-Cell Manufacturing | 2011-11-18 | Paper |
Throughput optimization in robotic cells with input and output machine buffers: a comparative study of two key models | 2010-06-11 | Paper |
Mitigating the risk of supply disruptions: a case study | 2009-09-13 | Paper |
Scheduling Multiple Parts in a Robotic Cell Served by a Dual-Gripper Robot | 2009-07-10 | Paper |
Supply chain scheduling: Just-in-time environment | 2008-09-03 | Paper |
Robotic cells with parallel machines: throughput maximization in constant travel-time cells | 2007-12-20 | Paper |
Throughput optimization in robotic cells | 2007-07-13 | Paper |
Scheduling web advertisements: a note on the minspace problem | 2007-05-15 | Paper |
Sequencing and scheduling in robotic cells: recent developments | 2007-05-15 | Paper |
A note on productivity gains in flexible robotic cells | 2006-11-17 | Paper |
Scheduling advertisements on a web page to maximize revenue | 2006-08-04 | Paper |
Scheduling dual gripper robotic cell: one-unit cycles | 2006-03-16 | Paper |
A review of TSP based approaches for flowshop scheduling | 2005-11-04 | Paper |
Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups | 2005-09-28 | Paper |
Scheduling and lot streaming in two-machine open shops with no-wait in process | 2005-06-01 | Paper |
Open shops with jobs overlap -- revisited | 2005-02-09 | Paper |
Approximation algorithms for \(k\)-unit cyclic solutions in robotic cells | 2005-02-09 | Paper |
Scheduling and lot streaming in flowshops with no-wait in process | 2003-08-21 | Paper |
Performance bounds of algorithms for scheduling advertisements on a web page | 2003-08-21 | Paper |
Scheduling in Robotic Cells: Heuristics and Cell Design | 2002-08-15 | Paper |
Operational decisions in AGV-served flowshop loops: Scheduling | 2002-06-09 | Paper |
Operational decisions in AGV-served flowshop loops: Fleet sizing and decomposition | 2002-06-09 | Paper |
Minimizing Cycle Time in a Blocking Flowshop | 2002-06-04 | Paper |
Parallel machine scheduling with a common server | 2001-11-21 | Paper |
https://portal.mardi4nfdi.de/entity/Q2741488 | 2001-10-24 | Paper |
A heuristic for scheduling two-machine no-wait flow shops with anticipatory setups | 2000-11-22 | Paper |
Minimizing makespan in a pallet-constrained flowshop | 1999-10-05 | Paper |
https://portal.mardi4nfdi.de/entity/Q4239706 | 1999-10-04 | Paper |
One-operator-two-machine flowshop scheduling with setup and dismounting times | 1999-09-22 | Paper |
Scheduling in robotic cells: Complexity and steady state analysis | 1999-08-02 | Paper |
Tabu search-based heuristics for cellular manufacturing systems in the presence of alternative process plans | 1999-05-05 | Paper |
Sequencing of robot activities and parts in two-machine robotic cells | 1999-03-01 | Paper |
Minimizing Makespan In Flowshops With Pallet Requirements: Computational Complexity | 1998-09-07 | Paper |
Design and operational issues in AGV-served manufacturing systems | 1998-04-02 | Paper |
Scheduling large robotic cells without buffers | 1998-04-02 | Paper |
Scheduling in Robotic Cells: Classification, Two and Three Machine Cells | 1997-11-25 | Paper |
Some Applications of the Generalized Travelling Salesman Problem | 1997-10-30 | Paper |
A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process | 1997-01-07 | Paper |
An efficient algorithm for a job shop problem | 1995-08-27 | Paper |
Performance of scheduling algorithms for no-wait flowshops with parallel machines | 1995-01-03 | Paper |
Open shops with jobs overlap | 1994-10-25 | Paper |
On the complexity of preemptive openshop scheduling problems | 1994-09-15 | Paper |
Optimal control of a class of DEDS: Flow-shops with state-dependent processing times | 1994-06-23 | Paper |
The complexity of scheduling jobs in repetitive manufacturing systems | 1994-02-28 | Paper |
Two-machine group scheduling problem with blocking and anticipatory setups | 1994-01-06 | Paper |
Hierarchical Control Of The Two Processor Flow-Shop With State Dependent Processing Times: Complexity Analysis And Approximate Algorithms | 1993-11-15 | Paper |
A Note On The Complexity Of Openshop Scheduling Problems | 1993-11-15 | Paper |
The two-machine permutation flow shop with state-dependent processing times | 1993-08-25 | Paper |
On the complexity of generalized due date scheduling problems | 1992-06-25 | Paper |
https://portal.mardi4nfdi.de/entity/Q3197606 | 1990-01-01 | Paper |
Scheduling algorithms for flexible flowshops: Worst and average case performance | 1989-01-01 | Paper |
Scheduling methods for a class of flexible manufacturing systems | 1989-01-01 | Paper |
Some no-wait shops scheduling problems: Complexity aspect | 1986-01-01 | Paper |