P. C. Bagga

From MaRDI portal
Person:167945

Available identifiers

zbMath Open bagga.p-cMaRDI QIDQ167945

List of research outcomes





PublicationDate of PublicationType
https://portal.mardi4nfdi.de/entity/Q30884702011-08-19Paper
Flowshop/no-idle scheduling to minimise the mean flowtime2006-01-23Paper
Flowshop/no-idle scheduling to minimize total elapsed time2006-01-23Paper
Bicriteria in a two-stage flowshop scheduling problem.2004-02-18Paper
Minimizing total elapsed time subject to zero total idle time of machines in \(n\times 3\) flowshop problem.2003-10-23Paper
Bicriteria in special flowshop problems2002-08-21Paper
Special class of flowshop sequencing problems2002-04-21Paper
https://portal.mardi4nfdi.de/entity/Q42279121999-02-02Paper
Sequencing with restrictions in processing times1998-08-02Paper
Minimizing Mean Completion Time for Special Flowshop Problems1997-06-16Paper
https://portal.mardi4nfdi.de/entity/Q43385631997-05-28Paper
Scheduling of job-block with dead line in n\(\times 2\) flowshop problem with separated set up times1985-01-01Paper
Special Cases With Set Up Considerations for n×3 Flowshop Problem1985-01-01Paper
Minimizing the makespan in a 2-machine flowshop with time lags and setup conditions1984-01-01Paper
https://portal.mardi4nfdi.de/entity/Q33218161984-01-01Paper
Optimal Algorithms for Job-Blocks in 2 × n Sequencing Problem with Transportation Times—A Computational Comparison1984-01-01Paper
https://portal.mardi4nfdi.de/entity/Q33437521984-01-01Paper
https://portal.mardi4nfdi.de/entity/Q30409151983-01-01Paper
https://portal.mardi4nfdi.de/entity/Q33327561983-01-01Paper
Node elimination in three-machine flowshop scheduling problem1982-01-01Paper
https://portal.mardi4nfdi.de/entity/Q30371111982-01-01Paper
https://portal.mardi4nfdi.de/entity/Q33152551982-01-01Paper
The Sngle Machine Problem with Quadratic Penalty Function1982-01-01Paper
Single Machine Schednling Problem with Quadratic Function of Completion Times-A Modified Approach1981-01-01Paper
Flow-Shop Sequencing with no Intratnachine Waiting: Minimization of Total Waiting Cost1981-01-01Paper
Note—A Node Elimination Procedure for Townsend's Algorithm for Solving the Single Machine Quadratic Penalty Function Scheduling Problem1980-01-01Paper
https://portal.mardi4nfdi.de/entity/Q38580011979-01-01Paper
https://portal.mardi4nfdi.de/entity/Q38872011979-01-01Paper
https://portal.mardi4nfdi.de/entity/Q39012851979-01-01Paper
A note on equivalent jobs for job blocks in job sequencing problems1978-01-01Paper
https://portal.mardi4nfdi.de/entity/Q41430001977-01-01Paper
https://portal.mardi4nfdi.de/entity/Q41465331976-01-01Paper
Two machine scheduling problem when passing allowed1973-01-01Paper
https://portal.mardi4nfdi.de/entity/Q32129201973-01-01Paper
Sequencing with Random Service Times1970-01-01Paper
Two stage production schedule1970-01-01Paper
https://portal.mardi4nfdi.de/entity/Q47729541969-01-01Paper
https://portal.mardi4nfdi.de/entity/Q55451651968-01-01Paper

Research outcomes over time

This page was built for person: P. C. Bagga