G. Wang

From MaRDI portal
Person:181201

Available identifiers

zbMath Open wang.guoqing.2MaRDI QIDQ181201

List of research outcomes





PublicationDate of PublicationType
Improved algorithms for dynamic lot sizing problems with incremental discount2019-01-14Paper
A stochastic boundary element method for piezoelectric problems2018-10-19Paper
Joint optimization of dynamic lot and warehouse sizing problems2018-05-30Paper
Invasion dynamics of competing species with stage-structure2018-05-15Paper
Model and algorithm for rescue resource assignment problem in disaster response based on demand-ability-equipment matching2018-03-08Paper
Maximum correntropy unscented Kalman and information filters for non-Gaussian measurement noise2018-02-05Paper
An effective GRASP and tabu search for the 0-1 quadratic knapsack problem2017-01-05Paper
An improved heuristic for parallel machine scheduling with rejection2016-07-06Paper
https://portal.mardi4nfdi.de/entity/Q34479702015-10-28Paper
Order acceptance and scheduling with machine availability constraints2015-02-18Paper
https://portal.mardi4nfdi.de/entity/Q49013172013-01-24Paper
Thin water films driven by air shear stress through roughness2012-05-10Paper
https://portal.mardi4nfdi.de/entity/Q31103112012-01-27Paper
Optimal policy for deteriorating items with trapezoidal type demand and partial backlogging2011-09-16Paper
Parallel machine scheduling problems with proportionally deteriorating jobs2009-03-10Paper
https://portal.mardi4nfdi.de/entity/Q53091052007-10-09Paper
Elastic wave field in a porous medium fully saturated with a Newtonian viscous fluid2007-08-28Paper
Preemptive scheduling with availability constraints to minimize total weighted completion times2005-04-22Paper
Complexity results for flow-shop problems with a single server2005-04-21Paper
An approximation algorithm for parallel machine scheduling with a common server2005-03-16Paper
A note on scheduling alternative operations in two-machine flowshops2005-01-19Paper
https://portal.mardi4nfdi.de/entity/Q44622102004-05-18Paper
The boundary contour method for piezoelectric media with linear boundary elements2003-11-10Paper
Parallel machine earliness and tardiness scheduling with proportional weights2003-05-14Paper
Two-machine flowshop scheduling with consecutive availability constraints2002-07-25Paper
Heuristics for two-machine no-wait flowshop scheduling with an availability constraint2002-07-25Paper
An improved heuristic for two-machine flowshop scheduling with an availability constraint2001-03-29Paper
A boundary integral formulation and 2D fundamental solutions for piezoelectric media2000-01-04Paper
One-operator-two-machine flowshop scheduling with setup and dismounting times1999-09-22Paper
General solution of plane problem of piezoelectric media expressed by ``harmonic functions1999-03-18Paper
Green's functions for a piezoelectric half plane1998-08-20Paper
Fundamental solutions for plane problem of piezoelectric materials1998-05-11Paper

Research outcomes over time

This page was built for person: G. Wang