Raymond G. Vickson

From MaRDI portal
Person:1870803

Available identifiers

zbMath Open vickson.raymond-gMaRDI QIDQ1870803

List of research outcomes





PublicationDate of PublicationType
One-Operator, Two-Machine Open Shop And Flow Shop Scheduling With Setup Times For Machines And Maximum Lateness Objective2023-05-05Paper
The Optimal Service Policies In An M/G/1 Queueing System With Multiple Vacation Types2023-04-24Paper
A Benders decomposition approach to product location in carousel storage systems2020-01-20Paper
Lot streaming for quality control in two-stage batch production2005-12-05Paper
One-operator, two-machine open shop and flow shop problems with setup times for machines and weighted number of tardy jobs objective2005-01-11Paper
A two-carousel storage location problem2003-05-14Paper
Optimal product and server locations in one-dimensional storage racks2001-03-22Paper
Optimal storage locations in a carousel storage and retrieval system1999-03-01Paper
Optimal positioning of read/write heads in mirrored disks1999-02-22Paper
Optimal lot streaming for multiple products in a two-machine flow shop1998-08-13Paper
On the probability distribution of total quality under sublot inspection and process restoration1997-08-05Paper
Optimal two-threshold policies in an M/G/1 queue with two vacation types1997-02-28Paper
A Survey of the Maximum Principles for Optimal Control Problems with State Constraints1996-02-13Paper
A simple approximation for mean waiting time in \(M/G/1\) queue with vacations and limited service discipline1993-08-16Paper
Two- and three-machine flow shop scheduling problems with equal sized transfer batches1992-09-27Paper
Routing Container Ships Using Lagrangean Relaxation and Decomposition1991-01-01Paper
A Model and Solution Algorithm for Optimal Routing of a Time-Chartered Containership1988-01-01Paper
Two heuristics for the economic lot scheduling problem: An experimental study1988-01-01Paper
A Single Product Cycling Problem Under Brownian Motion Demand1986-01-01Paper
Stochastic Production Planning with Production Constraints1984-01-01Paper
Optimal Control of Production Sequences: A Continuous Parameter Analysis1982-01-01Paper
Schedule Control For Randomly Drifting Production Sequences*1981-01-01Paper
Choosing the Job Sequence and Processing Times to Minimize Total Processing Plus Flow Cost on a Single Machine1980-01-01Paper
An optimal control problem with piecewise quadratic cost functional containing a ‘dead-zone’1980-01-01Paper
Generalized Value Bounds and Column Reduction in Finite Markov Decision Problems1980-01-01Paper
Stochastic Orderings from Partially Known Utility Functions1977-01-01Paper
Stochastic Dominance Tests for Decreasing Absolute Risk-Aversion II: General Random Variables1977-01-01Paper
Stochastic Dominance Tests for Decreasing Absolute Risk Aversion. I. Discrete Random Variables1975-01-01Paper

Research outcomes over time

This page was built for person: Raymond G. Vickson